The scope
Which stages you appoint: from an initial assessment to full management from idea to completion. Each service has a defined scope and a starting amount.
Guide / Fees
At Luthier, management fees start at €5,000 for the initial stage and reach €30,000 or more for full project management, depending on the scope appointed and the construction works budget. They are fixed fees, set in the proposal before appointment.
Luthier · Project ManagementUpdated October 2026.
01 / What sets the price
The amounts on this page are indicative. Before appointment, the proposal specifies deliverables, duration, reporting frequency, exclusions and taxes.
Which stages you appoint: from an initial assessment to full management from idea to completion. Each service has a defined scope and a starting amount.
Materials and labour for the works. It excludes the purchase of the plot or property, professional fees, permits and taxes. A larger project means more coordination, and fees are adjusted to that size.
02 / Prices by service
Good decisions from the very start.
From 5.000€ based on PEM
See detailIncludes
From design to a tenderable project.
From 6.000€ based on PEM
See detailIncludes
Trade packaging to cut costs.
From 8.000€ based on PEM
See detailIncludes
Technical and economic oversight.
From 15.000€ based on PEM
See detailIncludes
One counterpart, from the idea to handover.
From 30.000€ based on PEM
See detailIncludes
Indicative fees depend on scope and construction budget. Before appointment, the proposal will specify deliverables, duration, reporting frequency, exclusions and taxes.
03 / What is excluded
The works: the construction budget and what trades or the contractor invoice.
The fees of the architect, site technical directors and other professionals.
Permits, charges and taxes.
The statutory roles of the architect, site technical directors and safety coordinator.
Execution: Luthier does not carry out contractors’ works.
The decisions that remain yours: objectives, priorities and approvals.
04 / Fees versus margin
A general contractor charges for coordination as a margin on the works. A project manager charges fixed fees.
Typical margin of 15–25% on construction cost.
Grows with the construction budget.
Built into the price of the works, not shown separately.
Fixed fees from €8,000.
Set in the proposal, independent of the trades’ bids.
Separate from the works: you know what you pay for management and what for execution.
How to choose between the two models is explained in our guide on general contractors versus direct trade contracts. Read the guide
05 / How the price is set
In our first conversation we review the location, current stage, objectives and indicative budget to identify the right service and next step.
The proposal specifies deliverables, duration, reporting frequency, exclusions and taxes. It is the document that fixes the fees.
Once the proposal is accepted, work begins within the agreed scope. If you need another stage, it is assessed and proposed separately.
06 / To begin
Tell us the location, project stage, objectives and indicative budget. With that we identify the service that fits and prepare a proposal with a fixed amount.
07 / FAQ
Answers to help you make an informed decision before starting.
No. They are fixed fees that start from an amount per service and are adjusted to scope and construction budget. The proposal fixes them before appointment.
The construction works budget: materials and labour. It excludes the purchase of the plot or property, professional fees, permits and taxes. It is the reference for sizing the management.
The amounts on this page are indicative. The proposal details exclusions and taxes.
Yes. Each service is appointed independently. At the end of a stage we assess with you whether you need support in the next one.
Location, what you want to build or transform, objectives, indicative budget and desired timeline. Drawings or property documents help to be specific.
No. Management does not replace the statutory roles of the architect, site technical directors or safety coordinator, and Luthier does not carry out contractors’ works. We coordinate all of them.
The contractor charges for coordination as a margin on the works, typically 15–25% of the construction cost. Luthier Split charges fixed fees from €8,000, separate from the cost of the works.