How mucha construction project manager costs.

At Luthier, management fees start at €5,000 for the initial stage and reach €30,000 or more for full project management, depending on the scope appointed and the construction works budget. They are fixed fees, set in the proposal before appointment.

Luthier · Project ManagementUpdated October 2026.

01 / What sets the price

Two variablesand one proposal.

The amounts on this page are indicative. Before appointment, the proposal specifies deliverables, duration, reporting frequency, exclusions and taxes.

01

The scope

Which stages you appoint: from an initial assessment to full management from idea to completion. Each service has a defined scope and a starting amount.

02

The construction budget (PEM)

Materials and labour for the works. It excludes the purchase of the plot or property, professional fees, permits and taxes. A larger project means more coordination, and fees are adjusted to that size.

02 / Prices by service

What each service costsand what it includes.

01

Luthier Start

Good decisions from the very start.

From 5.000€ based on PEM

See detail

Includes

  • Technical & economic feasibility
  • Site or building analysis
  • Technical team selection
  • Initial cost & timeline estimate
02

Luthier Plan

From design to a tenderable project.

From 6.000€ based on PEM

See detail

Includes

  • Technical project review
  • Technical-economic comparison
  • Tender brief
  • Realistic construction schedule
03

Luthier Split

Trade packaging to cut costs.

From 8.000€ based on PEM

See detail

Includes

  • Briefs by lot
  • Transparent trade-by-trade tender
  • Budget validation
  • Economic tracking by line item
04

Luthier Build

Technical and economic oversight.

From 15.000€ based on PEM

See detail

Includes

  • Site meetings & minutes
  • Certifications & variance control
  • Project change management
  • Real-time shared platform
05

Luthier Full

One counterpart, from the idea to handover.

From 30.000€ based on PEM

See detail

Includes

  • All previous packs
  • Support from the idea stage
  • Centralised, shared system
  • Unified reporting

Indicative fees depend on scope and construction budget. Before appointment, the proposal will specify deliverables, duration, reporting frequency, exclusions and taxes.

03 / What is excluded

What the fees do not include.

Costs that are separate

  • 01

    The works: the construction budget and what trades or the contractor invoice.

  • 02

    The fees of the architect, site technical directors and other professionals.

  • 03

    Permits, charges and taxes.

What management does not replace

  • 01

    The statutory roles of the architect, site technical directors and safety coordinator.

  • 02

    Execution: Luthier does not carry out contractors’ works.

  • 03

    The decisions that remain yours: objectives, priorities and approvals.

04 / Fees versus margin

Fixed fees or a margin on the works.

A general contractor charges for coordination as a margin on the works. A project manager charges fixed fees.

General contractor

  • 01

    Typical margin of 15–25% on construction cost.

  • 02

    Grows with the construction budget.

  • 03

    Built into the price of the works, not shown separately.

Luthier Split

  • 01

    Fixed fees from €8,000.

  • 02

    Set in the proposal, independent of the trades’ bids.

  • 03

    Separate from the works: you know what you pay for management and what for execution.

How to choose between the two models is explained in our guide on general contractors versus direct trade contracts. Read the guide

05 / How the price is set

From the first conversation to the proposal.

  1. 01Stage 1

    Talk

    In our first conversation we review the location, current stage, objectives and indicative budget to identify the right service and next step.

  2. 02Stage 2

    Propose

    The proposal specifies deliverables, duration, reporting frequency, exclusions and taxes. It is the document that fixes the fees.

  3. 03Stage 3

    Appoint

    Once the proposal is accepted, work begins within the agreed scope. If you need another stage, it is assessed and proposed separately.

06 / To begin

A first conversation, with no strings.

Tell us the location, project stage, objectives and indicative budget. With that we identify the service that fits and prepare a proposal with a fixed amount.

07 / FAQ

Frequently asked questions

Answers to help you make an informed decision before starting.

01Are the fees a percentage of the works?

No. They are fixed fees that start from an amount per service and are adjusted to scope and construction budget. The proposal fixes them before appointment.

02What is the PEM?

The construction works budget: materials and labour. It excludes the purchase of the plot or property, professional fees, permits and taxes. It is the reference for sizing the management.

03Do the amounts include taxes?

The amounts on this page are indicative. The proposal details exclusions and taxes.

04Can I appoint a single stage?

Yes. Each service is appointed independently. At the end of a stage we assess with you whether you need support in the next one.

05What do you need to quote a price?

Location, what you want to build or transform, objectives, indicative budget and desired timeline. Drawings or property documents help to be specific.

06Does a project manager replace the architect or the contractor?

No. Management does not replace the statutory roles of the architect, site technical directors or safety coordinator, and Luthier does not carry out contractors’ works. We coordinate all of them.

07How does it compare with a general contractor?

The contractor charges for coordination as a margin on the works, typically 15–25% of the construction cost. Luthier Split charges fixed fees from €8,000, separate from the cost of the works.

Let's talk.

A first conversation, with no strings, to understand your project.

Or reach us directly:
hola@luthier.pm
Your data stays with us. We only use it to reply to you.

Your data stays with us. We only use it to reply to you.