01Does the project manager replace the architect?+
No. The design and the technical direction of the works are the architect’s and the site direction team’s roles, and management does not replace them. The project manager handles costs, procurement, follow-up and the owner’s decisions, and works with the architect.
02Isn’t that the same as the technical architect’s site direction?+
No. Site direction controls how the works are built and answers for it against the design and regulations. The project manager looks at the works from the owner’s side: what they cost, how they are contracted, what is decided and why.
03What if my architect already asks contractors for quotes?+
That is common, and useful. But it is not their appointment and nobody pays them for it, and once the works start it usually gets dropped. The difference lies in comparing bids on the same basis of scope, quality and exclusions, in studying whether direct trade packages are worthwhile, and in having someone follow the money during the works independently of whoever is paid.
04How are responsibilities shared?+
You decide objectives, priorities and approvals. Luthier provides information, alternatives, owners and follow-up of the appointed scope. The technical team keeps the design, the validations and their professional roles according to their appointments.
05Can you join when the design is complete?+
Yes. We review what needs clarification before tendering: scope, quantities, specifications, trade interfaces and schedule. The proposal reflects the actual project stage.
06How do you make bids comparable?+
We establish a common scope and requirements, then review items, specifications, exclusions and timing to explain the differences before you decide.
07Does Plan include appointing trades or managing construction?+
Plan prepares the project and tender process. Trade procurement and construction monitoring have separate scopes that can be added through Split, Build or an integrated appointment.