Guide / Living abroad

Renovating in Barcelonawhile living abroad.

It can be done, and it is done often. What changes when you live abroad is not the works: it is who looks at them for you every week. The architect designs and directs the works technically; the contractor or the trades build them. Someone has to compare the bids, follow the money, document every change and bring you the decisions ready to take. That is the role of an owner’s representative in Barcelona.

Luthier · Project ManagementUpdated October 2026.

01 / What changes

Four thingsthat work differently from a distance.

None of them needs you on site. All of them need someone who is.

01

Decisions arrive in writing

On site, decisions are taken in the corridor. From abroad, each one comes to you with the alternatives, the cost and the deadline, and is recorded once taken. Nothing depends on a call you missed.

02

Money follows verified progress

Each payment certificate is checked on site against what has really been built before you pay. Deposits are kept to a minimum and a retention is held as guarantee until handover.

03

Changes are decided before, not after

Any extra is documented with its reason, scope and price, at the bid’s own unit rates, and waits for your approval. You never discover a change on the invoice.

04

One interlocutor, in your language

A single point of contact who speaks Spanish, Catalan and English, coordinates architect, trades and your lawyer, and answers for the whole picture, not for one trade.

02 / Who does what

What stays yours and what we do in Barcelona.

Representation does not mean replacing you. You decide; we prepare the decision and check that it is carried out.

What stays with you

  • 01

    Objectives, priorities and every approval that matters.

  • 02

    Signing the contracts with the architect, the contractor or each trade.

  • 03

    Paying, from your bank or through whoever your lawyer advises.

  • 04

    Choosing what you want to see: photos, drawings, samples, video calls.

What your representative does on site

  • 01

    Prepares the tender basis and compares the bids on the same scope and quality.

  • 02

    Coordinates the architect, the site direction team and the trades.

  • 03

    Checks each payment certificate against real progress before you pay.

  • 04

    Documents every change with its cost and impact and brings it to you for approval.

  • 05

    Sends a periodic written report with photos, money committed and pending decisions.

  • 06

    Follows the snagging and the economic and documentary close at handover.

03 / The method

How it works from the first call to handover.

  1. 01Stage 1

    Prepare

    Before contracting: we review the design with your architect, prepare the tender basis and obtain comparable bids, so you decide with figures, not estimates.

  2. 02Stage 2

    Contract

    You sign. Each contract carries scope, quality, exclusions, unit prices for extras, a phased schedule and payments tied to progress.

  3. 03Stage 3

    Follow

    During the works: site meetings, certificate checks, documented changes and a periodic report. Video calls in your language whenever a decision needs it.

  4. 04Stage 4

    Hand over

    Snagging, final documentation and economic close. You receive the home and the file that goes with it.

Clear roles. Shared direction.

You decide

Objectives, priorities and approval of decisions within your remit.

Luthier coordinates

Information, options, responsibilities and follow-up of the agreed scope.

The technical team

Design, technical approvals and professional duties under their appointments.

04 / Before you start

What usually goes wrong at a distance, and what we ask for in writing.

Almost every remote renovation that goes badly fails on the same four points. All four are avoidable before the first payment.

What usually goes wrong

  • 01

    Large deposits and payments that do not depend on progress.

  • 02

    Decisions taken by chat, with no record of who approved what.

  • 03

    Extras priced after the fact, at prices nobody compared.

  • 04

    Nobody on site the week it matters.

What we ask for from the start

  • 01

    Comparable bids on the same scope, quality and exclusions.

  • 02

    Payment terms tied to verified progress, with a retention as guarantee.

  • 03

    Unit prices in the contract for any extra.

  • 04

    A single written record of decisions, changes and approvals.

  • 05

    With your lawyer: who may sign or pay on your behalf, if you need it, and how.

How to put three quotes on the same basis is explained in our guide on comparing construction quotes. Read the guide

05 / What it costs

Fixed fees, separate from the works.

Representation during the works is Luthier Build: continuous coordination, certificate checks, documented changes and reporting. If you want one interlocutor from the first decision to handover, Luthier Full covers design, procurement and works.

Fees are fixed and set in the proposal before appointment. They are separate from the construction cost and from the architect’s and other professionals’ fees.

PEM: construction cost (materials and labour).

06 / FAQ

Frequently asked questions

Answers to help you make an informed decision before starting.

01Do I need to travel during the works?

Not for the follow-up. It is worth being in Barcelona at the start, to agree objectives and meet the team, and at handover. Anything in between can be decided with the report, photos and a video call.

02How do I receive information?

A periodic written report with photos, progress, money committed and the decisions waiting for you, plus a video call in Spanish, Catalan or English whenever a decision needs it. Everything stays in one record you can go back to.

03How do payments work from abroad?

You pay each company yourself, against progress we have checked on site. Whether you pay from your own bank or give someone a power to do it for you is something to agree with your lawyer; we do not handle your money.

04I have not bought yet. Should I ask before buying?

Yes. Before buying, we can review the technical and economic conditions of the works you have in mind with the available documentation. It is the Luthier Start stage, and it does not replace the legal checks of the purchase.

05Do you work with contractors or with direct trades?

With both. Where the works allow it, we recommend direct trade contracts with a dedicated coordination: you avoid the general contractor’s margin and spread the risk between contracts. The choice is explained in our guide on general contractors versus direct trades.

06Will you work with my architect and contractor?

Yes. We coordinate with the existing team and define responsibilities, communication channels and the decisions belonging to each party.

07Can I appoint Build after work has started?

We can assess joining a live project after reviewing its condition, contracts, documents and outstanding decisions, then define what monitoring we can take on and from when.

Let's talk.

A first conversation, with no strings, to understand your project.

Or reach us directly:
hola@luthier.pm
Your data stays with us. We only use it to reply to you.

Your data stays with us. We only use it to reply to you.